/

Bathroom refit

Walk-in shower and new pipework in a 1920s home

Location

Oakland

Duration

6 working days

Price

Fixed at $8,400

Project lead

Walt Kovac

Walk-in shower with a teak bench and tiled walls

On this page

Portrait of engineer Sam

Project lead

Walt Kovac

The problem

The house still had its original lead supply pipes and a cast-iron bath that had been leaking into the joists for years. The owners wanted a shower they could walk into and pipework they would never have to think about again.

What we did

Removed the bath, tiles and all lead pipework back to the main

Re-piped the bathroom in copper and pressure tested it

Replaced two rotten joists and levelled the floor

Fitted a level-access shower tray, glass screen and thermostatic valve

Tiled, sealed and finished, with underfloor heating under the tiles

Stone-tiled walk-in shower with a rain head
Folded towels on a stool beside the new shower

The result

Finished on day six, as quoted, at the fixed price of $8,400. No lead left in the house, a dry subfloor and a shower the owners use without stepping over anything.

“Finished on the day they said, to the dollar they quoted. The old lead pipes are finally gone.”

Portrait of Hannah R.

Hannah R.

Bathroom refit ·  Oakland

Planning something similar?

Book a free survey and get a fixed written quote within two working days.

(415) 555-0142

Answered by a person, 24/7

Planning something similar?

Book a free survey and get a fixed written quote within two working days.

(415) 555-0142

Answered by a person, 24/7

Planning something similar?

Book a free survey and get a fixed written quote within two working days.

(415) 555-0142

Answered by a person, 24/7

Create a free website with Framer, the website builder loved by startups, designers and agencies.