
A bathroom refit is mostly labor and plumbing changes. The suite you choose matters less than moving the toilet or the shower.
What changes the price most
Moving the toilet or the drain is the biggest single cost, because it means lifting the floor. Keeping things where they are keeps the price down.
Tiles and finishes
Floor-to-ceiling tiles take longer to fit than a half-tiled room. Large tiles on an uneven wall also need more preparation.
Getting a fixed quote
We measure up for free and send a fixed written quote, so the price you agree is the price you pay.
Free survey
Bathroom survey, no charge

Written by
Walt Kovac
Bathroom fitter with 30 years of tiling, levelling and finishing behind him.


